Installing the MOC 2 on the MGS Spacecraft Nadir Panel
Table of Contents
Setting up in SSB 201 Cleanroom
Fixing the Wide Angle Camera Problem
- Installing on the Spacecraft
Testing of the MOC was completed Tuesday night (6 December) around 8:45 PM. The instrument was scheduled to be integrated onto the nadir equipment deck (NED) of the spacecraft Wednesday night. The plan called for transporting the instrument to the High Bay at around 3 PM, practicing the procedure for attaching the handling fixture and transporting the instrument to the NED, and then, around 8 PM, to install the MOC.
JPG = 177 KBytes
GIF = 417 KBytes
Caption: The MOC Delivery Team (minus 2).
JPG = 177 KBytes
GIF = 417 KBytes
Caption: Preparing to Install the MOC on the NED.
Right: The large, overhead crane has attached to it an additional, special hydraulic fixture (the "Hydra Set," top) that permits precision, very slow lifting and lowering of objects.
Lower Left: Attaching the cables of the Hydra Set to the empty MOC lifting fixture.
JPG = 248 KBytes
GIF = 540 KBytes
Caption: The MOC is Encapsulated within its Handling/Lifting Fixture.
Upper Right: Ed removes the "soft cover."
Middle Left: Phil Stapler (LMA), Jose (hidden behind MOC), and Ed (on ladder) guide "Jaws" over the MOC as Mike Clawson (JPL QA) watches.
Middle Right: Lowering "Jaws" over the upper end of the NA telescope.
Lower Left: Guiding "Jaws" down the length of the NA telescope.
Lower Right: Ed locks one of the three "knuckles" that grip the electronics cylinder at the base of the telescope.
JPG = 146 KBytes
GIF = 311 KBytes
Caption: Preparing the MOC for Integration.
Upper Right: The holes in the MOC feet are roughened for better electrical connectivity and for holding the through-hole bolts that will affix the MOC to the NED. "Steel wool" is used, with a vacuum hose near-by to suck up stray particles.
Lower Left: A cleaning/treating solution is applied to the hole.
Lower Right: The MOC is ready to put on the spacecraft!
JPG = 146 KBytes
GIF = 311 KBytes
Caption: Moving the MOC across the Room.
Upper Right: Passing the MOC across an intervening table (towards the NED).
Lower Left: Another view of the MOC as it is "handed" across an intervening table (towards the NED).
Lower Right: Positioning the MOC over its mounting position on the NED (the +Y, -X side of the nadir panel).
JPG = 146 KBytes
GIF = 311 KBytes
Caption: The MOC is lowered and attached to the NED.
Upper Right: Almost there. The MOC is a few millimeters above the 3/4-inch thermal insulating standoffs to which it mounts. This is a good view of the purge fitting.
Lower Left: Bolting the MOC to the NED.
Lower Right: "Jaws" and the MOC in position on the NED, awaiting the arrival of the Thermal Emission Spectrometer (TES). On the opposite side of the NED from the MOC (i.e., foreground) is the Mars Horizon Sensor Assembly (MHSA), part of the Attitude and Articulation Control Subsystem (AACS).
After installation, the MOC was checked out on Friday and Saturday (8-9 December). Friday was devoted to the Initial Power Turn-On (IPTO) test, which includes checking each wire in each cable before powering the camera. The test was completely successful. Saturday was devoted to the Functional Electrical Test (FET), which exercises the MOC and its electrical connections to the spacecraft (including the bakeout and cruise survival heaters). Portions of the test were run successfully, but problems in uploading the Payload Data System (PDS) prevented completion of the test. It was finally re-run (with complete success) on 18 December, with MOC personnel participating remotely via the NASCOM connection through JPL to LMA.
The MOC now awaits the arrival of the rest of the payload. The next major activity will be the spacecraft systems tests, roughly in the March 1996 timeframe.