Testing of the MOC was completed Tuesday night (6 December) around 8:45 PM. The instrument was scheduled to be integrated onto the nadir equipment deck (NED) of the spacecraft Wednesday night. The plan called for transporting the instrument to the High Bay at around 3 PM, practicing the procedure for attaching the handling fixture and transporting the instrument to the NED, and then, around 8 PM, to install the MOC.



ninjas2 icon The Cleanroom Ninjas
JPG = 177 KBytes
GIF = 417 KBytes

Caption: The MOC Delivery Team (minus 2).
The MOC Team posing with the camera in its shipping container and the handling fixture ("Jaws," seen at left rear). From left to right, the team consists of Jose Tamayo (Caltech, MOC Flight Hardware Technician), Ed Danielson (Caltech, MOC Instrument Manager), Rick Stiebel (JPL, MOC Quality Assurance Engineer), Mike Malin (MSSS, MOC Principal Investigator), Mike Caplinger (MSSS, MOC Ground Data System and Flight Software Design Scientist), and Jeff Warren (MSSS, MOC Software Engineer). Not pictured are Lynn "Doug" Douglas and Steve LaBrecque.

The MOC team arrived at LMA mid-morning and began packing for the move into the High Bay facility. By noon, we were ready to move. The spacecraft team was ready around 1:00 PM, so the decision was made to advance the schedule.



install1 icon Preparing to Install the MOC
JPG = 177 KBytes
GIF = 417 KBytes

Caption: Preparing to Install the MOC on the NED.
Upper Left: LMA technicians prepare the NED for receiving the MOC. Since this was a "flight mate," the actual flight thermal protection/isolation blanket that fits beneath the MOC had to be prepared and installed, which is the activity shown in this picture.

Right: The large, overhead crane has attached to it an additional, special hydraulic fixture (the "Hydra Set," top) that permits precision, very slow lifting and lowering of objects.

Lower Left: Attaching the cables of the Hydra Set to the empty MOC lifting fixture.

The crane was then used to raise and lower the handling fixture ("Jaws") above the work table, and the operators practiced the rates at which they would move the crane once the camera was inside the fixture.



install2 icon Encapsulating the MOC in its Handling Fixture
JPG = 248 KBytes
GIF = 540 KBytes

Caption: The MOC is Encapsulated within its Handling/Lifting Fixture.
Upper Left: Jose and Rick lift the MOC out of its shipping container and up onto the work table.

Upper Right: Ed removes the "soft cover."

Middle Left: Phil Stapler (LMA), Jose (hidden behind MOC), and Ed (on ladder) guide "Jaws" over the MOC as Mike Clawson (JPL QA) watches.

Middle Right: Lowering "Jaws" over the upper end of the NA telescope.

Lower Left: Guiding "Jaws" down the length of the NA telescope.

Lower Right: Ed locks one of the three "knuckles" that grip the electronics cylinder at the base of the telescope.



install3 icon Preparing the MOC for Integration
JPG = 146 KBytes
GIF = 311 KBytes

Caption: Preparing the MOC for Integration.
Upper Left: "Jaws," with the MOC inside, is lifted a few inches above the work table.

Upper Right: The holes in the MOC feet are roughened for better electrical connectivity and for holding the through-hole bolts that will affix the MOC to the NED. "Steel wool" is used, with a vacuum hose near-by to suck up stray particles.

Lower Left: A cleaning/treating solution is applied to the hole.

Lower Right: The MOC is ready to put on the spacecraft!



install4 icon Transporting the MOC over to the NED
JPG = 146 KBytes
GIF = 311 KBytes

Caption: Moving the MOC across the Room.
Upper Left: A view from the floor, looking up at "Jaws" as the crane begins to move it across the room to the NED.

Upper Right: Passing the MOC across an intervening table (towards the NED).

Lower Left: Another view of the MOC as it is "handed" across an intervening table (towards the NED).

Lower Right: Positioning the MOC over its mounting position on the NED (the +Y, -X side of the nadir panel).



install5 icon Attaching the MOC to the NED
JPG = 146 KBytes
GIF = 311 KBytes

Caption: The MOC is lowered and attached to the NED.
Upper Left: Positioning the MOC over the three foot locations. These pictures provide a good view of the white-thermal-painted electronics cylinder (which houses the block redundant MOC electronics) and the fitting to which the N2 purge gas line will be attached (translucent white plastic with dark fittings and tubing just below lip of "Jaws").

Upper Right: Almost there. The MOC is a few millimeters above the 3/4-inch thermal insulating standoffs to which it mounts. This is a good view of the purge fitting.

Lower Left: Bolting the MOC to the NED.

Lower Right: "Jaws" and the MOC in position on the NED, awaiting the arrival of the Thermal Emission Spectrometer (TES). On the opposite side of the NED from the MOC (i.e., foreground) is the Mars Horizon Sensor Assembly (MHSA), part of the Attitude and Articulation Control Subsystem (AACS).



After installation, the MOC was checked out on Friday and Saturday (8-9 December). Friday was devoted to the Initial Power Turn-On (IPTO) test, which includes checking each wire in each cable before powering the camera. The test was completely successful. Saturday was devoted to the Functional Electrical Test (FET), which exercises the MOC and its electrical connections to the spacecraft (including the bakeout and cruise survival heaters). Portions of the test were run successfully, but problems in uploading the Payload Data System (PDS) prevented completion of the test. It was finally re-run (with complete success) on 18 December, with MOC personnel participating remotely via the NASCOM connection through JPL to LMA.

The MOC now awaits the arrival of the rest of the payload. The next major activity will be the spacecraft systems tests, roughly in the March 1996 timeframe.



Back to Fixing the Wide Angle Camera Problem